3. Reports‎ > ‎Face-to-face meeting‎ > ‎DAILY REPORTS‎ > ‎

Daily Report 2/13

Daily report N°1:

 

Team 1 – HydroEurope17

February 13th, 2017

 

Benoît BESSEAS                                              Kamila FUSIEK

Océane CALMELS                                            Arianna VARRANI

Laura DAUL                                                      Taline ZGHEIB

Guillaume HAZEMANN                                     Zhengmin LEI

Quentin MOLIERES                                      

 

Supervisors: Philippe GOUBERSVILLE, Olivier DELESTRE

 

I.                   Introduction

 

The topic of our team for the first week is “Calibrate or not calibrate? Which parameters and variables in kind of hydrological models (black box, reservoirs, physically based, etc...).

Around this topic, we held a brainstorming meeting and defined the daily tasks for each member. Several software and models are chosen for solve the problematic. With the help of supervisors’ advices, we refined the tasks and the final conclusion we need to get. A final weekly report and a presentation are asked to be accomplished on Friday.

 

II.                Problematic

 

“Calibrate or not calibrate? Which parameters and variables in kind of hydrological models (black box, reservoirs, physically based, etc...). As 1994 Var catchment flood is no longer the single study issue for this two week, we need to focus on the comparison of impact of calibration on different models (black box, mathematical model, physical model).

 

Team 1 supervisors discussing the first problematic with the team

III.              Methodology

 

We choose HEC-HMS, MIKE SHE as our hydrological analysis software. Three models will be worked on during this week, which are black box (empirical model), mathematical model and physical model. HEC-HMS is based on conceptual model while MIKE SHE is bases on physical model. Available data like Rainfall intensity, topography, land use, runoff losses and catchment storage can be downloaded on the HydroEurope website or found on the internet ourselves.

First of all, the definition of calibration need to be given. Then we need to well understand the concept of the three models. After several simulations on HEC-HMS and MIKE SHE by different calibration, we are supposed to compare the results of the two software on different aspects. Try to analyze and conclude the impact of calibration.

 

Team 1 discussing methodology and planning tasks

IV.              Allocation of tasks

 

Table 1: Allocation of task for 1st week

 

GIS Analysis

HEC-HMS

MIKESHE

Black Box model

Final report

Benoît BESSEAS

 

 

 

 

 

Océane CALMELS

 

 

 

 

 

Laura DAUL

 

 

 

 

 

Kamila FUSIEK

 

 

 

 

 

Guillaume HAZEMANN

 

 

 

 

 

Zhengmin LEI

 

 

 

 

 

Quentin MOLIERES

 

 

 

 

 

Arianna VARRANI

 

 

 

 

 

Taline ZGHEIB

 

 

 

 

 

 

We also planned the schedule for the upcoming week: 


Table 2: Daily team’s mission

Monday 2/13

Tuesday 2/14

Wednesday 2/15

Thursday 2/16

Friday 2/17

• Analysis of the question

• Definition of the calibration

• Plan of what will be done and how

• Allocation of tasks

• Beginning of the • GIS task

• Beginning of the set ups of HEC-HMS and MikeSHE tasks

• Writing of the daily report

• Update of the website

• Finish GIS analysis

• Black box model

• Finish the set ups of the models on HEC-HMS and MikeSHE

• Start to run and calibrates the models on HEC-RAS and MikeSHE

• Write the beginning of the final report

• Daily report
• Update the website

• Continue running and calibration of the models + calibration on HEC-RAS and MikeSHE

• Write the beginning of the final report

• Daily report
• Update the website

• Start the presention for Friday?

• Conclusion of the modelling parts

• Finish the presentation

• Prepare the presentation

• Continue writing the hydrological part for the final report

• Presentation time!

• Download weekly report

 